Patrick Barnwell (https://www.1patrickbarnwell.com/) was at that time second head painter and made all of the tests for this elaborate scenic technique.
Patrick Barnwell now an independent stage painter and artist was therefore called upon to take on the artistic direction and execution of the works.
On the night of September 4, the cleaning of the floor and the removal of the old layer of finish started at 2 a.m. and ended on Tuesday, September 5 at 12:30 p.m. with a validation of the floor. (With a show that travels around the world, everything runs on a tight schedule).
The floor was finished with 2 coats of Bona Traffic HD Silkmatt.